Saturday, December 12, 2009

Operation Unicorn

Raise and position-Operation Unicorn Complete!


Release rope slowely at the building site.
































Walk down the driveway.








Tie rope to the back end of the fork lift. Creating the afore mention unicorn.
































Then swing the rope end towards the back end of the fork lift.












Start by tying a rope to the end of the log.













Because the rain created such a muddy mess on the path from the meadow down to the job site a new plan and route had to be worked out. New plan, take the logs down the driveway. Problem the driveway is not wide enough for a forty foot log. Solution "Operation Unicorn".














No comments:

Post a Comment