A giddy Sparky looking out from the third floor with his breast cancer support ear protection device. Save the tata's!
Looking from the third floor down at the current storage unit and future garden site.
View from the third floor looking towards the meadow.
Up in scissor lift looking down at Dave.
Row #11 complete, with dusting of snow.
The first girder, second floor support.
The temporary door into the house.
Inside house working on row #7.
Putting log dog in place to hold log until it's securely pinned.
Second row log #5.
Ever seen a log Ninja?
Carving a slot for washers to bolt down log at both sides of every door.
Trimming off excess log to butt against the pass log.
Log #4 drilling holes in bottom of log to line up with rebar in foundation.
Bailey the fuzzy supervisor.
TA-DA!!!
Dave pounding rebar over to secure the log to the foundation.
Log #3.
Lunch break.
Shortening rebar with grinder before bending it over to hold log in place.
Log #2.
Lower log #1 down onto the rebar.
First log ready to be stacked.